Design submission to MPW runs
To initiate the circuit submission process, every institution must register and set up a CRM Interface account. Please do not wait until the MPW run deadline date to register and update your settings of your CRM Interface account. This would save your valuable time and avoid unnecessary stress leading up to your MPW submission. Please register to CRM Interface as soon as a circuit tape-out through CIME-P is planned.
1. FOUR WEEKS prior to the commencement of the MPW run
All institutions are requested to pass through the Design kit request process flow in CRM Interface. The NDA related flow on the CRM Interface platform will be expedited for institutions with active NDAs in place after registration and verification.
Designers should submit a reservation request for the run in question.
The CIME-P staff member in charge of the run will verify and validate your reservation.
Please keep in mind that you can cancel any time the reservation before the MPW run deadline.
This reservation allows run managers to organize and reserve silicon area for a circuit for a particular technology.
2. When the design is ready for submission
Once your reservation is approved, you may submit an order for your circuit (by clicking “submit an order” on “run” tab) in your CRM Interface account, which will then grant you FTP access space to upload your design(s).
If packaging is required, designers may also send a bonding diagram.
3. Design submission
The design submission can be done two weeks before the deadline, and at the latest by the deadline date.
Designs submitted must be free of DRC errors and without antenna rules violations.
Two files required for design submission:
Please note that all the files should be transferred via CRM Interface.
Please respect the naming conventions for the design submissions as listed below:
-
- The design layout in GDSII format, compressed with the command “gzip -9”, named as follows: Topcell_name.gds.gz
- The stream-out report file generated by the CAD software during the GDSII export, named as follows: Topcell_name.pipo
Additional information related to design transfer methodology:
1. Transfer by email:
Design transfer by email is not allowed without an authorization from CIME-P.
To request for a CIME-P authorization, please send a request by E-mail with
your full details and provide the file sizes.
CIME-P will then send you instructions how to proceed.
2. Tracking the design checking process
CRM Interface will provide the user with an overview of the design submission at every stage of the design preparation. You should either receive an email or a notification regarding updates related to the submitted circuit.